Decoration company decoration process allows you to decorate without trouble

For newcomers who just picked up. For the decoration, I do not know where to start, in fact, the decoration process is very tedious, a lot of details need attention. Many people will consider looking for a decoration company to operate, but they also worry that they do not understand being deceived. Xiao Bian will take everyone with you today to understand what the decorating company's decoration process is like. This will allow you to have a good understanding of the pre-decoration period.

Decoration company decoration process :

1, pre-design

In the preliminary design, the decoration company will arrange the designer to measure the owner's house on the ground. The designer communicates with the owner, combines the owner's preferences, needs to be tailored, and will be given after 3-5 days Budget quotations and programs. If there is no problem, you can sign a contract.

2. Demolition of the wall

If the owner’s house needs to be involved in the demolition of the main body, then this is the first step in the renovation process, including the demolition of the wall, the wall, and so on.

3, hydropower construction

After the main body was demolished, it was time to reach the hydropower stage. Before doing the hydropower, it was necessary to measure the dimensions of the cabinets and reserve the location of the hydropower in advance. After the hydropower is completed, the waterproofing of the toilet area and the balcony area will begin.

4, Mason process

Next is the division of the mason, woodworking, mason and oil workers are interspersed. General decoration company is to see which type of work has time, the first to do that project, but if the workers can arrange the case, ceiling materials can be done first ceiling, there are tiles can be tiled, but also install the door stone, marble windowsill As well as floor drains, woodworkers are responsible for installing door and window covers and furniture production.

5, paint project

The paint link is mainly to paint the wall, (including the woodworking furniture also paint). The wall paint must first be puttyed and leveled, and then paint the latex paint. If color is involved, it is recommended that you pay attention to the color, and do not have color difference.

6, finished product installation

After the paint is almost finished, the next step is to install the finished product, such as switch socket installation, lighting installation, curtain rod installation and so on.

7, pioneering cleaning

After the finished product is installed, it is in the stage of cleanliness. When it is pioneering cleaning, it is recommended that homes do not have furniture and unnecessary household appliances, and the curtains should not be installed so that the sanitation can be more thorough.

Summary of the article: The above is a summary of the decorating company's decoration process for everyone. I believe we have a certain understanding of the decoration process. There are still many places in the process of subdividing the decoration process. The owners need to pay attention to it from time to time. Which materials need to be prepared in advance and which steps cannot be omitted. If you need to learn more about the later stage, please pay attention to our website information.