Fluorographite has been widely used in solid lubrication, corrosion protective and antifouling coatings,Li-CFx batteries and other fields due to the merits of extremely low surface energy,excellent chemical and thermal stability, outstanding lubrication performance and super theoretical specific capacity.
After a long period of use, the secondary construction column concrete pump will have a decline in efficiency and is not easy to use. In fact, the user does not need to have too much entanglement about this, any mechanical equipment is bound to be lossy, and the production capacity is also It will decline. In this process, all the user needs to do is to maintain the equipment according to the manufacturer's maintenance manual or related rules. This method is used to reduce the loss of the secondary construction column concrete pump and increase the service life.
Having said that, in what way should the maintenance work of the secondary structural column concrete pump be done? Without further ado, the editor summarizes the maintenance work of the secondary structure column concrete pump after collecting it in various aspects. Simply share with you, if there is something wrong, welcome to point out that it will be corrected in time.
1. Inspection and maintenance work of equipment components: check whether the electrical equipment is in the specified working state, and also do some regular inspection work; check whether the oil level of the hydraulic oil is within the specified scale line, and the oil quality is degraded If necessary, new oil needs to be replaced; the technician cleans the inside of the hopper without concrete slag and debris, S-tube: all parts are in good condition and the fastener links are reliable.
2. The visual inspection of the hydraulic system: the solid state of each pump, oil motor and valve meets the requirements, the connection with the oil pipe is firm, and the seal is good; when the coupling is rotated by hand to rotate all the pumps, there should be no jamming and abnormality Sound; manual directional valve should be flexible and reliable.
3. Concrete delivery pipeline inspection: each pipe should be inspected before taking over. The interior should be clean and smooth with no cracks in appearance; the clamp and its connecting screws should be intact and clean, and the rubber sealing ring in the clamp should be intact and elastic, without Cement dry slag; the pipeline should be laid as flat as possible, connected firmly, the support is firm, the support is reliable, and does not contact the debris that damages the pipe fittings.
If the secondary construction column concrete pump wants a long service life, it should do so. This is not only a guarantee for the construction, but also a good improvement in the performance and life of the equipment. If your secondary construction column concrete pump is facing this situation, act quickly.