How to operate the rough room renovation?

Buying a house will inevitably require renovation to stay in. Whether it is preliminary decoration, simple decoration or fine decoration, it can be, mainly to see the economic ability of the owner. Many people buy rough houses because of the low price of rough houses. How should the rough house be renovated? What are the renovation steps for the rough room ? Don't worry, the decoration home decoration network Xiaobian introduces you!


毛坯房装修步骤


  The steps for the renovation of the rough room are as follows:

The first step: the area of ​​the rough room decoration must be determined, and the wall size should be measured.

1. The area involved in the decoration process, especially the area of ​​the brick, the area of ​​the wall paint, the area of ​​the wallpaper and the area of ​​the floor.

2. The size of the main wall surface, pay special attention to the size of the wall where the furniture should be placed in the future.

The second step: rationally demolishing the rough house, the space is not wasted.

The demolition here is mainly to demolish walls, build walls, shovel wall skins, dismantle heating and replace plastic steel windows. The hydropower transformation proposal is recommended in one step. Do not dismantle or dismantle it. Because once the brick is on the wall and the ceiling is sealed, the follow-up work will be difficult to develop. Therefore, the position of switches, lamps, basins, bathtubs, washing machines, etc. must also be determined here. The dismantled garbage should be cleaned up in time, which is mainly for the convenience of the renovation work.

The third step: the appearance of the pipe in the rough room is optimized to enhance the decorative effect.

In general, the toilet and bathroom are installed with the most pipes, and these two are also the most entangled positions in the whole rough room decoration, which need anti-slip and ensure the drying effect. Therefore, it is necessary to optimize the appearance of the pipe, which has both moisture-proof and decorative functions.

The fourth step: mainly the matting of the tiles, that is, the ground floor decoration.

Before tiling, you need to prepare the floor drain. After waterproofing and finishing, it is the tiling work. The placement specifications should be well grasped, the tiles need to be soaked in water and dried in the shade, and the broken ones can be left for cutting.


毛坯房装修


Step 5: Beautify the walls and let the rough room shine.

To make the walls of the rough room look beautiful, it is recommended to put a wallpaper on it. Generally, the nitrocellulose paint is applied to the place where the wallpaper is to be attached, and the next day, it can be dried. Do not open the window for 48 hours after the wallpaper is posted. The wallpaper should be slowly dried. If some parts are tilted, you can ask the master to help repair.

Step 6: Arrange the socket installation in the rough room and finish the work in half a day.

The renovation steps of the rough house , the decoration house decoration network small series will bring you these, the actual operation may be more complicated, the owner can carry out the decoration according to the specific conditions of the house. For more exciting content of decoration, please pay attention to our decoration encyclopedia!

QJ Deep Well Pump

Naipu QJ Series are vertical multi-stage submersible pumps designed for pumping clean water from deep wells, rivers, reservoirs and mines etc., as well as applications in industrial water supply , agricultural irrigation projects. Fire fighting and so on. QJR is specially designed for geothermal applications featured by heat-resisting, anticorrosion and anti-aging properties, water temperature up to 90℃.

Typical Applications---

Water drawing tool submerging into water to work
Drawing the groundwater from the deep well
Drawing engineering of rivers reservoirs, channels, and soon
Irrigation of farmland
Solar submersible

NP-QJ Deep Well Pump Configuration Drawing

Construction drawing


Main Part Number At The Drawing

1. Pump casing
2. Pump Cover
3. Impeller
4. Shaft
5. Wear Ring
6. Impeller Cap
7. Braking Pad
8. Shaft Sleeve
9. Packing Gland
10. Seal Cage
11. Packing
12. Cantilever Bearing Assembly



QJ DEEP WELL PUMP SELECTION CHART


selection chart

NP-QJ DEEP WELL PUMP WORKSHOP SHOWING

performance parameters


Deep Well Water Pumps,Deep Well Pump,Deep Well Bore Pump,Vertical Submersible Water Pump

Shijiazhuang Naipu Pump Co., Ltd. , https://www.naipu-pump.com