Bathrooms deal with water all year round, and there is a lot of moisture inside, and the tiles on the wall often appear to fall off. When the bathroom is being renovated, it is not only necessary to do a waterproof project. It is also very hard to put on a wall tile. Otherwise, one day you are happy to take a shower, suddenly a piece of tile off, can not scare it! Let's take a look at how the bathroom is tiled so it is not easy to fall off. 1, the bathroom tile first floor flat Lay the tiles that have not been painted on the floor, knock them flat, and then spread the cement on the tiles and spread them on the ground to keep the diagonal alignment of the four tiles. The sequence of paving tiles is actually quite stressful. Paving tiles should be pasted from the inside to the outside, and where slopes or floor drains are encountered, it is also necessary to pay attention to the direction of drainage. The paving of wall tiles should be carried out from below. . In order to make the final paving effect beautiful, the bottom layer of the tile must be affixed at the end; after the wall tile is laid, the floor tile is pressed. It should be noted here that when a ceramic tile is attached, it cannot be attached to the top of the wall, otherwise it will easily fall off due to the weight of the tile. Paved floor tiles try not to step on. 2, shop bathroom tiles before the water Because the ceramic tile itself has many small holes, strong water absorption capacity, dry tiles will dry the moisture of the cement, making it less fit, hollowing and falling off easily after laying. Therefore, the tiles must be soaked for 24 hours until no blisters appear, then they are allowed to dry and then spread. The advantage of this is that the affixed tiles will not absorb water from the cement, and the paste will be more firm. Hollowing, detachment, and other phenomena will not occur easily. 3ã€After the bathroom floor tile is fully submerged in water Before the wall surface is covered with cement mortar and tiles, the wall surface needs to be treated with water and wet to prevent the dry wall from absorbing the moisture in the cement mortar too quickly, thereby reducing the cement mortar adhesive effectiveness, resulting in empty tiles. If it is tiled with adhesive, the wall surface does not need to be treated with water and wet, but it needs to be leveled beforehand. 4, clean the wall surface before laying tiles Laying a tile is like sticking two things together with glue. If there is something dirty on the surface of a stuck object, it will seriously affect the sticky effect. If there are residual wallpaper, latex paint, lime plaster on the wall, there are cement, garbage, etc. on the floor, be sure to clean them first, otherwise it will affect the cement and grass-roots adhesion effect. If there is a crack in the wall itself, it must be treated before the tiles can be tiled to prevent the tiles from falling off due to cracks. For the ground, uneven wall or straight place should be leveled. This will put the perfect tile. Tiles
Solenoid dosing pump, a very special dosing pump which are widely used in the water treatment for the chemical dosing. It offers an extensive range of features, including microprocessor control for accurate and flexible automation in response to instrument signals. The microprocessor design employs a customized liquid crystal display (LCD) and a tactile response keypad. The "state-of-the-art" surface mount electronics are fully encapsulated to ensure protection in its working environment. All external inputs and outputs are opto-isolated from the microprocessor. With more than 10 years of production evolution, All AILIPU pumps are tested and rated under hot conditions guaranteeing that the flow and pressure ratings meet the specifications. there are no standards when pump encounter with certain type of chemicals, so it offers a variety type of material for choosen. In each unit package, including 2 and 3 meter outlet pipe, injection valve and bottom valve, besides with instruction, packing list and certification.Our Solenoid dosing pump is the best solenoid pump.
If you want to buy Mechanical Diaphragm Metering Pump, Solenoid Diaphragm Metering Pump, Piston Dosing Pump,Water Treatment Dosing Pump, Plastic Chemical Diaphragm Metering Pump, please contact us.
Solenoid Dosing Pump,Pvc Head Solenoid Dosing Pump,Pvdf Head Solenoid Dosing Pump,Automatic Control Solenoid Dosing Pump,Piston Dosing Pump,Best Solenoid Pump Zhejiang Ailipu Technology Co., Ltd. , https://www.alipu.com