Super practical! Home decoration master summary decoration construction process

The order of renovation should be: 1 preliminary design - 2 main body demolition - 3 hydropower reform - 4 carpentry - 5 tiling - 6 brush wall paint - 7 kitchen ceiling - 8 cabinet installation - 9 Wooden door installation - 10 floor installation - 11 paving wallpaper - 12 radiator installation - 13 switch socket installation - 14 lighting installation - 15 hardware sanitary installation - 16 curtain rod installation - 17 pioneer cleaning - 18 Furniture approach - 19 appliance installation - 20 home accessories decoration.

(I) Pre-design

In the same way, the difference between humans and bees is that the construction of bees is a reflection of instincts. Before humans are built, ideas and frameworks are first formed in the mind. Therefore, if the home improvement compared to a battle, then the pre-design home improvement is the battle of the "war plan" is the home improvement "soul link." In the early design, one thing that must be done is to conduct a detailed measurement of the room, which mainly includes:

1. Identify the area involved in the renovation process. Especially the tiling area, wall paint area, wallpaper area, floor area;

2, clear the main wall size. In particular, it is necessary to design the wall size of the furniture later. Also note that before starting work, do not forget to go to the property for start-up procedures and pay the decoration deposit.

(II) Demolition of the main body

Into the construction phase, the main demolition reform is the first project on the first, mainly including the demolition of walls, walls, spade shovel, demolition heating, change steel windows and so on. When the main body is dismantled and reformed, it is to put the framework of the construction site first.

(III) Hydropower Reform

Before the hydropower reform, the demolition of the main structure should be basically completed. Between the two stages of hydropower reform and main body demolition, the first measurement of cabinets should also be carried out. In fact, the so-called cabinet first measurement has no actual content, because the wall and the ground are not processed, the cabinet designer can not give a specific design size, but only for the developer reserved water inlet, hood socket Location, make some suggestions. Mainly include: 1, to see if the hood position of the hood affect the installation of the hood;

2, see if the location of the water meter is appropriate;

3, to see if the position of the inlet is convenient for installing the sink later. For the first measurement of the cabinet, a little experience is completely self-contained. After the waterway is completed, it is best to do the waterproofing of the bathroom. The kitchen does not generally need to be waterproof.

Unless it is the main material needed for the demolition of the main body, the entry time of main materials such as tiles and large core boards should be after the hydropower reform. Because the circuit modification involves ground slotting, if tiles or large core boards are improperly positioned, it is troublesome for workers to move in and out.

(d) Woodworking

Carpenters, bricklayers, and oil workers are the "three brothers" in the construction process. The basic order of appearance is: wood-tile-oil. The basic appearance principle is - who is dirty and who is the first. "Who is dirty? Whoever is above" is also one of the basic principles that determine the order of home improvement. In fact, carpentry activities such as installing standpipes, making decorative ceilings, and attaching plaster lines can be considered in a sense as a detailed link of the main demolition and reform. They themselves do not conflict with the transformation of water circuits, and sometimes they still need some. Cooperate. When preparing a false wall at home, it is necessary to consider whether there are hydropower lines on the false wall, and if so, the hydropower reform workers should be buried.

(five) tiling

If the workers are too busy, the foreman will normally allow the bricklayer to enter the tiling when the “wooden boss” is not over. This is normal, because there is no conflict between the two. In the process of “bricklayer”, the following three steps are also involved:

1. The installation of door stone and marble windowsill. The installation of the door stone can be done together with the paving tiles, or after the paving tiles, the installation of the marble window sill is usually done after the window cover is done. The marble worker will prepare the glass glue, and the marble and the window cover are sealed with glass glue. Now.

2, the installation of floor drain. The floor drain is the first one to appear in the home improvement hardware because it needs to be installed together with the floor tile. Therefore, when you start shopping for building materials, you should try to buy a floor drain.

3, hood installation. The hood is the first appearance of the appliance. After the kitchen tiles are laid, you can consider installing the hood. “The bricklayer's second cousin” leaves the floor. At this time, the cabinet can be measured for the second time. Accurately speaking, after the wall tiles have been attached and the hood is installed, the second measurement of the cabinet can be performed.

Decoration Process Del Floor Nature Flooring Wallpaper Window Door Painting Furniture Decoration Decoration Decoration Company Decoration Style Home Wallpaper Glass Brick Cabinet Door Marble Tile Kitchen Ceiling Ceiling Home Cabinetry Craft Glass Glass Furniture Marble Cabinet Kitchen Cabinet Door Floor Tiles Home Crafts Glass Door Kitchen Glass Sliding Doors Bathroom Tiles Bathroom Doors Bathroom Ceiling Material Bathroom Door Size Bathroom Size Toilet Design Toilet Ceiling Overall Toilet Public Toilet Toilet Waterproof Bathroom Floor Tile Toilet Leakage Home Furnishing Home Decoration Home Tile Glue Kitchen Tile ld Tile Floor Tile Decoration Home

1 23 Next> Total 3 Pages
Page to page
Function assignPage() { var page = $('#page_val').val(); if (/_\d+\.html$/.test(location.href)) { location.href = location.href.replace( /_\d+\.html/, ((page == 1) && 1? '' : '_' + page) + '.html') } else if(/\/\d+\.html$/.test (location.href)) { location.href = location.href.replace(/(\d+)\.html/, ((page == 1) && 1? '$1' :'$1_' + page) + ' .html') } } $(function(){ $('#page_form').submit(function() { assignPage() return false; }) $('#page_btn').click(function(){ assignPage( ); return false; }) }) See full story