Operation steps for sewage pumping and leak detection of temperature shock test chamber refrigeration unit

The operation steps of sewage injection and leak detection of the temperature shock test chamber refrigeration unit are as follows: The operation steps of the sewage impact test chamber refrigeration unit for sewage discharge and leak detection are as follows:
1. Connect the pressure reducing valve to the nitrogen bottle, and connect the nitrogen bottle pressure reducing valve with the system ammonia valve with a nitrogen tube;
2. Open all valves in the system except the valves that connect to the atmosphere;
3. Open the ammonia addition valve and the nitrogen valve, and fill the system with nitrogen to the low pressure part test pressure;
4. Close the ammonia-adding valve and the nitrogen valve, and use a brush to stain the soap, water or detergent to all the joints, pipe joints, flanges, valves, etc., and seal the joints for leak detection;
5, find the leak point, mark the mark, find a batch of leak points, the temperature shock test chamber laboratory operator is located in the safe position of the blowdown operation to unscrew the lower part of the low-pressure circulating liquid reservoir (or gas-liquid separator) , discharge and release nitrogen;
6. To make up the leak, screw on the screw plug of the low-pressure circulating liquid reservoir (or gas-liquid separator), refill with nitrogen, and the operator is in the safe position of the sewage operation to unscrew the screw plug in the lower part of the intermediate cooler to discharge the sewage and release nitrogen;
7. Repeat the previous two steps until there are no leaks;
8. Close the low pressure circulating liquid reservoir (or gas-liquid separator) inlet valve and drain valve, close the drain bucket outlet valve and drain valve, compressor suction valve and drain valve, and fill the system with nitrogen to High pressure part test pressure;
9. In the high-pressure part of the temperature impact test chamber, check the leak, find the leak point, mark the mark, find out a batch of leak points, the operator is located in the safe position of the blowdown operation, unscrew the screw plug at the lower part of the drain bucket, discharge and discharge Nitrogen
10. Make up the leak, screw on the screw plug of the drain barrel, refill with nitrogen, and the operator of the temperature impact test chamber is located at the safe position of the blowdown operation to unscrew the screw plug at the lower part of the high pressure reservoir, draining and releasing nitrogen;
11. Repeat the previous two steps until there are no leaks. Operation steps for sewage injection and leak detection of temperature shock test chamber refrigeration unit http://

Http://news.chinawj.com.cn Editor: (Hardware Business Network Information Center) http://news.chinawj.com.cn

365nm LED Grow Light

Ultra Plantâ„¢ Grow Light offers One Chip Technology aimed to meet your indoor growing expectation such as improve plants' quality, increase yield, or better the margin, etc., all for helping you realize a higher return on your crops.


Ultra Plantâ„¢ Grow Light is combined our advanced All-In-One technology with patented optical design and customized light full spectrum supported from our experienced LED engineers, plant specialists and other partners working on horticulture.


From Ultra Plantâ„¢ APP, you are able to schedule the growing process including photoperiod, brightness and spectral in advance. The lighting system will help you grow smarter, easier and better.


Ultra Plantâ„¢ is the most versatile horticultural grow lighting fixture for indoor plants with flexible full spectrum, brightness control and uniform, wider light distribution, suitable for top lighting of all types of crops. No matter it applies to anywhere for any crop, Ultra Plantâ„¢ can do perfect work for you.

365Nm Led Grow Light,365Nm Led Grow Lights,Best 365Nm Led Grow Lights,365Nm Grow Lights

Feton Corporation , https://www.ultraplantled.com