Just after the floor was newly paved and was soaked, what should I do? Qi Jia experts pointed out: After this situation occurs, the water on the floor should be cleared immediately, and then promptly notify the property and the original selection of the floor of the business, it is best to take pictures of the site in order to dispute as evidence. The owner can make up for the following two methods. If it is caused by a large amount of water in the floor due to a certain reason, and the amount of water is large, the floor manufacturer or its customer service should be promptly consulted when cleaning the site, because different floor treatment methods are not the same. In a short period of time, as far as possible, the floor should be completely dismantled, because in addition to the bathroom, the kitchen, living room, and bedroom are generally not waterproof, so it is necessary to clean up the water on the ground as soon as possible to avoid leakage to the downstairs to cause greater losses. If it is partially soaked in water, after clearing for a period of time, observe whether there is a significant change in the floor. If there is an edge, contact the floor worker in the shop to perform a partial replacement and calculate the required floor area for maintenance. If there is a floor left during the initial paving, workers may be required to use this floor for paving. If there is no surplus, you need to check the batch or model of the flooring you need before paving, because only the floor with the same floor color and the same specifications can be used. Otherwise, it will not be installed and the color difference will occur. And, be sure to wait until the ground is dry before you can pave. Experience Talk Nature Flooring Del Floor Bathroom Toilet Waterproof Classic Spc Flooring,Classic Spc Floor,Classic Spc Plank Flooring,Classic Spc Laminate Flooring JIANGSU PERFECT NEW MATERIAL TECHNOLOGY CO., LTD. , https://www.bffloor.com
Sanxiang floor