The first thing to measure positioning is to measure the uniform height. Use pencil to mark on the tile.

The second thing is to make a hole in a tile with a 6MM drill bit in the position marked with a pencil.

Due to the fact that some places in the Mason were not well-placed, several difficult holes appeared on the cement used for the tile.

Schematic

Wooden pillow

The third step is to hit the wooden pillow in the hole. This is the wooden pillow that is used to knock the small wooden pillow into the hole.

The fourth step is to install the corner line to fix the corner line on the wooden pillow

Because the corner line is straight, the corners need to be seamed like a tile at 45 degrees.

Further trimming

Patchwork

Schematic

Schematic

Step 5 Drill holes in the ceiling In order to install the main keel, holes must be drilled in the ceiling

Punching

Step 6 Assemble the boom This is the boom

The entire boom is threaded According to the height of the bathroom ceiling, the extra boom is sawn off with a saw

Then install the big crane and steel expansion screw on both ends of the boom

Schematic

Schematic

Step 7 Install the Hanger Use a hoe to pry into the hole in the ceiling

Then use pliers to turn the nut under the steel expansion screw. The steel expansion screw expands in the ceiling.

This completes the installation of the boom

Step 8 The main keel wears the main keel in the big hanging under the boom

Step 9 Prepare the auxiliary keel The vice keel is also called the triangular keel

Cut the secondary keel with scissors based on the actual length

It is a triangular mouth that is joined by another part.

Step 10 Install the auxiliary keel above the main keel. Both types of keel are perpendicular to each other

Step 11 Install Nanoplates

All the gussets are fastened to the auxiliary keel instead of the main keel

In the process of installation, most of the nano-boards are installed in one piece, but it is inevitable to cut them in the upper corners.

Pencil first

A few knives along the line with a blade

Use scissors to cut a mouth

Then it is folded up and down

Finally, you need to re-measure with a ruler to see if it is right.

Twelfth Step Installation of Lighting Appliances Yuba First Installation Try Before You Install All Appliances Are Tested Before Hanging on the Ceiling

Step 13: Exhaust pipe installation All exhaust pipes are inside the ceiling

There are generally exhaust exhaust pipe + water heater exhaust pipe + exhaust fan exhaust

Installed schematic

Ceiling Mount Appliances Cement Toilet Ceiling

Laminate Flooring

Laminate flooring is mainly made of high density fiber board,pressed on top the decor paper to imitate the wood design and wear layer on top to make sure it has good performance of anti-scratch.With cheaper cost,laminate flooring is popular with global customers.

The important thing to remember is laminate is thick and tough, not like plastic-based flooring that you can score and snap with a knife, so you`ll need powered saw and should be comfortable using one.

Laminate Flooring,Waterproof Flooring,Household Flooring,Parquet Laminate Flooring

CHANGZHOU ART DECORATION MATERIALS CO.,LTD , https://www.cnartdecor.com